Bathroom Renovation cost calculator
Bathroom Renovation in George Town, Penang typically costs RM 14,000 to RM 22,000 in total for a mid-tier job.
Enter your details below for an instant RM range. Figures are sourced from our bathroom renovation cost guide and are an indicative estimate, not a quote.
RM 14,000 to RM 22,000 total
Assumes mid-tier finish, George Town pricing.
This is an indicative estimate, not a quote. Your actual price depends on scope, materials, and site conditions.
Rates reviewed 2026-07-07. Source: cost guide.
Get exact quotes from a vetted contractorBathroom Renovation cost by city
| City | Typical range |
|---|---|
| Bukit Mertajam | RM 9,800.00 to RM 15,400.00 |
| Butterworth | RM 11,900 to RM 18,700 |
| Bayan Lepas | RM 13,300 to RM 20,900 |
| George Town | RM 14,000 to RM 22,000 |
| Tanjung Bungah | RM 16,100.00 to RM 25,300.00 |
Ranges shown at the mid-tier renovation tier. Figures for cities other than George Town are adjusted from the George Town baseline.
Bathroom Renovation cost by finish tier
| Finish tier | Typical range |
|---|---|
| Cosmetic refresh | RM 7,700.00 to RM 12,100.00 |
| Mid-tier renovation | RM 14,000 to RM 22,000 |
| Full strip-and-rebuild | RM 21,000 to RM 33,000 |
| Rebuild / extension | RM 29,400 to RM 46,200 |
George Town pricing. Use the calculator above for figures adjusted to your city.
Rates editorially reviewed by Wei Han, founder of Penang Renovations, against the published cost guide, which was drafted with AI assistance and reviewed for factual accuracy against local contractor rates.
Bathroom Renovation pricing questions
- How much does a bathroom renovation cost in George Town?
- A George Town bathroom renovation falls into four bands: cosmetic refresh RM 8,000-14,000 (surfaces and fixtures only, no waterproofing), functional upgrade RM 14,000-22,000 (adds shower screen, partial replumbing, selective waterproofing), full strip-and-rebuild RM 22,000-35,000 (hack to slab, new layout, full waterproofing), and premium/heritage RM 35,000-45,000+ (designer fixtures, heritage tilework, structural changes).
- What drives cost variance within a bathroom renovation band in George Town?
- Four factors push a same-band project RM 4,000-8,000 higher: hack waste disposal in walk-up buildings without a goods lift (adds RM 600-1,500), hacking through thick pre-1990 slabs (RM 500-1,200 extra), moving the toilet more than 2 metres from the existing stack which requires a floor build-up of 50-80mm (adds RM 1,500-3,500), and strata management constraints like restricted working hours that add 5% to labour cost.
- How long does a bathroom renovation take in George Town?
- A cosmetic refresh takes 5-8 working days, a functional upgrade 10-14 days, a full strip-and-rebuild 18-28 days, and a heritage bathroom 4-8 weeks depending on approval lead times. Bathroom renovations are particularly disruptive because they take out your only wet area, so budget for alternative arrangements during the demolition and waterproofing-cure phase.
- What's usually NOT included in a George Town bathroom renovation quote?
- Most quotes exclude the mirror or shaving cabinet (RM 400-1,500), towel bars and accessories (small but often forgotten), exhaust fan upgrade (RM 250-900), and hot-water heater replacement (RM 350-3,500 depending on type). These add up to RM 3,000-6,000 on a full rebuild and are easy to miss when comparing quotes.