Renovation Contractor cost calculator
Renovation Contractor in George Town, Penang typically costs RM 67 to RM 129 per square foot for a mid-tier job.
Enter your details below for an instant RM range. Figures are sourced from our renovation contractor cost guide and are an indicative estimate, not a quote.
RM 6,700 to RM 12,900 total
Assumes 100 sq ft, mid-tier finish, George Town pricing.
This is an indicative estimate, not a quote. Your actual price depends on scope, materials, and site conditions.
Rates reviewed 2026-07-07. Source: cost guide.
Get exact quotes from a vetted contractorRenovation Contractor cost by city
| City | Typical range (per sq ft) |
|---|---|
| Bukit Mertajam | RM 46.90 to RM 90.30 |
| Butterworth | RM 56.95 to RM 109.65 |
| Bayan Lepas | RM 63.65 to RM 122.55 |
| George Town | RM 67 to RM 129 |
| Tanjung Bungah | RM 77.05 to RM 148.35 |
Ranges shown at the mid-tier renovation tier. Figures for cities other than George Town are adjusted from the George Town baseline.
Renovation Contractor cost by finish tier
| Finish tier | Typical range (per sq ft) |
|---|---|
| Cosmetic refresh | RM 36.85 to RM 70.95 |
| Mid-tier renovation | RM 67 to RM 129 |
| Full strip-and-rebuild | RM 100.50 to RM 193.50 |
| Rebuild / extension | RM 140.70 to RM 270.90 |
George Town pricing. Use the calculator above for figures adjusted to your city.
Rates editorially reviewed by Wei Han, founder of Penang Renovations, against the published cost guide, which was drafted with AI assistance and reviewed for factual accuracy against local contractor rates.
Renovation Contractor pricing questions
- How much does it cost to renovate a terrace house in Penang?
- A terrace house renovation in Penang typically costs RM 60,000-300,000+, or roughly RM 80-250 per square foot. A cosmetic refresh is RM 60-110k, a mid-tier renovation RM 120-180k, a full strip-and-rebuild RM 180-280k, and a rebuild with extension RM 250-400k+. A standard double-storey terrace most commonly lands in the RM 120-220k range.
- What drives the cost of a terrace renovation?
- Four main levers: the number of wet areas (kitchens and bathrooms cost most per square foot), layout change (removing a load-bearing wall adds RM 4,000-12,000 per opening for the beam and engineer), material grade (plywood vs particleboard cabinetry, quartz vs porcelain countertops), and structural surprises in older houses, which is why a 10-15% contingency is advised.
- How long does a terrace house renovation take in Penang?
- A cosmetic refresh takes 4-8 weeks, a mid-tier renovation 3-4 months, a full strip-and-rebuild 4-6 months, and a rebuild with extension 6-9 months. Add time for MBPP or MBSP approval on any extension or structural change, plus a wet-season buffer.
- Does a George Town heritage terrace cost more to renovate?
- Yes. A terrace inside the George Town UNESCO conservation zone costs 25-40% more than an equivalent suburban terrace because of conservation permit requirements and conservation-grade materials. Always check the lot's gazette status before scoping the work.